24-hour standard turnaround All 50 states NEC 2023 · IFC · NFPA 855 Engineering since 2013
Solar Designs USA Plan sets & PE stamps

Code

California's solar mandate for new homes: how big the system must be, and how to build it for less

11 min read · Verified

Short answer

Since January 1, 2020, California's Energy Code has required a solar PV system on every newly built single-family home. The current 2025 code keeps the same rule: the minimum size is (conditioned floor area × A) ÷ 1,000 + (dwelling units × B), with A and B set by climate zone, capped by what fits on the home's solar access roof area. A typical 2,000 sq ft home needs roughly 2.2 to 4.6 kW, depending on the climate zone. No system is required if the result is under 1.8 kW, and the size can drop 25% with a qualifying battery of at least 7.5 kWh.

What the law requires

California's Building Energy Efficiency Standards (Title 24, Part 6) made solar mandatory on new low-rise homes starting with the 2019 code, which took effect on January 1, 2020. The rule carried into the 2022 code and the current 2025 code, which applies to permit applications from January 1, 2026. It sits in Section 150.1(c)14:

  • Every newly constructed single-family home needs a new PV system meeting Joint Appendix JA11. Additions and alterations aren’t covered, and multifamily buildings follow their own rules in Section 170.2.
  • The system must be at least the size given by the code’s equation, or the most that fits on the home’s solar access roof area, whichever is smaller.
  • It doesn’t have to be on the house. The Energy Commission’s guidance allows a ground mount or a carport on the lot.

How the minimum size is calculated

Equation 150.1-C gives the minimum size in kW DC:

kWPV = (CFA × A) ÷ 1,000 + (NDU × B)

CFA is the conditioned floor area in square feet, NDU the number of dwelling units, and A and B come from Table 150.1-C for the home’s climate zone. The result is capped at the solar access roof area (SARA) times 18 watts per square foot on steep-sloped roofs, or 14 on low-sloped roofs.

Minimum system size calculator

An estimate from Equation 150.1-C and Table 150.1-C of the 2025 code. The home’s energy compliance report (CF1R) sets the official number. Check the climate zone by ZIP code; zone lines don’t follow city limits.

Climate zoneA (per sq ft)B (per dwelling)2,000 sq ft home
10.7931.272.86 kW
20.6211.222.46 kW
30.6281.122.38 kW
40.5861.212.38 kW
50.5851.062.23 kW
60.5941.232.42 kW
70.5721.152.29 kW
80.5861.372.54 kW
90.6131.362.59 kW
100.6271.412.66 kW
110.8361.443.11 kW
120.6131.402.63 kW
130.8941.513.30 kW
140.7411.262.74 kW
151.561.474.59 kW
160.591.222.40 kW

The exceptions

  • Under 1.8 kW: no PV is required when the equation gives less than 1.8 kW DC. Small homes and many small detached ADUs fall under it; a 600 sq ft unit in climate zone 9 comes to 1.73 kW.
  • Too little roof: no PV is required if the solar access roof area is under 80 contiguous square feet. On steep roofs, faces pointing between 300° and 90° (roughly north) don’t count, and neither does any area with under 70% annual solar access.
  • With a battery: the PV size may be cut by 25% when the home also gets a JA12-qualified battery of at least 7.5 kWh. The Energy Commission says this can’t be combined with the 1.8 kW exception to get out of solar altogether.
  • Snow loads and older approvals: roofs where the building department finds PV can’t meet the snow-load requirements, and projects approved by planning before January 1, 2020 with conditions that limit the roof.

Separately from the PV rule, the 2025 code requires new one- and two-unit homes with services over 125 A to be battery-ready (Section 150.0(s)), unless a battery is installed.

How jurisdictions handle the permit

The Energy Code sets the size; each building department decides how the solar gets reviewed. In practice it goes one of two ways:

  • Solar plans with the building plans. Some departments want the PV design in the original construction set, reviewed with everything else.
  • Separate solar permit later. Others let the builder pull a separate solar permit during construction, but won’t sign the building’s final inspection until the solar is approved and inspected. A late solar permit is a common reason a finished house waits for its final.

Ask at intake which route the department uses, and schedule the solar plans so they never hold up the final. The system installed must match the size on the home’s energy compliance report (CF1R), and the installer completes the PV installation certificate for the final.

Building the minimum system for less

Most builders install exactly the required minimum: it’s a code item, and under the net billing tariff that has applied to new solar customers of PG&E, SCE and SDG&E since April 2023, exported power earns far less than it used to. A few choices keep that minimum system cheap:

  1. Size to the number, with high-wattage panels. Round up to whole panels and no further. Higher wattage means fewer panels, attachments and labor hours: 2.59 kW is 7 panels at 430 W, but 9 at 300 W.
  2. Skip the combiner panel and the gateway on small micro-inverter systems. A small system, such as five or six panels on Enphase microinverters, fits on a single branch circuit. That branch can run straight from the roof to an AC disconnect next to the main panel and land on a backfed breaker, with no combiner box and no gateway. It saves hundreds of dollars and wall space. Stay within the manufacturer’s branch-circuit limit, and check that the utility has no metering or monitoring requirement of its own.
  3. Put the array on the roof face nearest the main panel. Short AC runs mean less wire and conduit, and an attic run is cheaper than one on the outside wall.
  4. Rough it in during framing. Plan the conduit path and the attachment locations while the roof is open, and install the attachments in the right order with the roofing: on low-slope roofs the standoffs go on the deck first and the roofing goes around them. See the attachment order by roof type.
  5. Check the busbar early. A minimum system is usually easy on a 200 A panel: a 200 A bus with a 200 A main leaves 40 A for backfeed under the 120% rule. Check it in the busbar 120% calculator.
  6. Use the battery exception only when the owner wants a battery anyway. A 25% smaller array rarely pays for a 7.5 kWh battery on its own.

Sources

Checked November 2026 against the 2025 Building Energy Efficiency Standards (CEC-400-2025-010-F, Section 150.1(c)14, Equation 150.1-C and Table 150.1-C), the Energy Commission’s 2025 single-family solar PV guidance, and its Spring 2025 Blueprint summary of changes. Confirm details with the building department and the home’s energy consultant before you submit.

Builders: we draw new-construction solar plan sets in California to the CF1R size, ready to include with the building plans or to submit on their own, and we offer contractor pricing for builders with regular work. Start a work order or call 323.682.2282.

More from the knowledge base